Tables
Traffic Volume
- 24 Hour Volume Map Toronto 2009 – City of Toronto
- AM Rush Hour Volume Map Toronto 2009 – City of Toronto
- PM Rush Hour Volume Map Toronto 2009 – City of Toronto
Technology
- Expressway Traffic Optimization by Steve Petrie
Reports
- World Class City, World Class Vision – Toronto by Steve Woods and Jose Ramon Gutierrez – Transportation Toronto
- Subways-vs-LRT Analysis of the Expert Advisory Panel Report to Toronto Council by Steve Woods and Krista Moore
- Report of the Expert Advisory Panel Regarding Transit on Sheppard Avenue East
- Gardiner Expressway and Lake Shore Boulevard East Reconfiguration Environmental Assessment (EA) and Integrated Urban Design Study – City of Toronto
- St. Clair Ave. West Dedicated Right-of-way report by District Chief Bob Leek
- Urban Mobility Report 2011 by David Schrank
- Mobility Investment Priorities Project – Texas Transportation Institute
- Transportation Tomorrow Survey – 4th Report – University of Toronto
Media
- Toronto Sun – Tear down east end of Gardiner Expressway: City staff
- Toronto Star – Alarm raised over St. Clair right-of-way
- Toronto Star – Fire chief says St. Clair is safe
- National Post – New subway costs already over budget
Advertisements